EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
jseaborn
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (336)
Research
- (7)
Workshop
- (2)
Empennage
- (13)
Fuselage
- (24)
Firewall
- (2)
Wings
- (181)
Controls
- (26)
-
Brake Update
-
Brakes
-
Brake Pedals
-
Brakes assemblies
-
Brake progress
-
Remaining rudder...
-
Brakes. They're the...
-
Aircraft Spruce...
-
Heel brakes
-
Going forwards by...
-
Put the brakes on...
-
Rudder pedals
-
New rudder cables
-
Brake Pedals
-
Rudder pedal and...
-
Rudder pedal and...
-
Brake Pedals
-
Brake Pedals
-
Installed pedals and...
-
Rudder pedal and...
-
Rudder pedals
-
Further reassembly
-
Refinished Control...
-
Control sticks and...
-
Pushrod reassembly
-
Pushrod refurb
Avionics
- (2)
Lighting
Instrument Panel
- (12)
Landing Gear
- (42)
Engine
Propeller
Fuel System
- (5)
Interior Finish
Paint / Decals
Inspection
- (5)
Tools
Canopy
- (3)
Electrical
- (9)
For Sale
- (3)
Builder Name:
Jeff Seaborn
-
Project:
Dalotel DM165
-
VIEW REPORTS
Total Hours:
653
Total Flight Time:
Start/Last Date:
Nov 06, 2019 - Nov 06, 2019
Engine:
Originally Continental IO-346 A what? Yep, an IO-346 as used in Muskateers of the same vintage
Propeller:
A Regy Wooden Fixed Pitch What the heck is that? A French prop from that era
Panel:
Steam gauges circa 1969. In French and in metric. Yikes!
Friendly URL:
https://eaabuilderslog.org?s=jseaborn
Home or Last Project Picture
Jan 06, 2022
Brake Pedals
- (2 hours)
Category: Controls
Fabricated the last parts for the brake pedals. Cleaned up all the parts, deburring, countersinking, etc. Riveted parts together to complete each pedal.
Completed pedals.
Backside of pedals.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.